
![]()
What is it?
·
An easy to install and
use Electrical power monitor that can be fitted on either a permanent or a
temporary basis on any size of installation
from 5amp single phase to 3000 amp 3 phase.
What does it do?
·
Monitors electrical
power
·
Displays the results
directly in £+p
·
Records and graphs power
use over any time period.
·
Gives you the ability,
by the use of a touch screen display to monitor and record :-
1.
The name of the plant or area under test.
2.
Individual Job numbers related to the test
3.
Start and stop times of the test period.
4.
Alarms and events can be set
5.
Min and Max values can be captured
All parameters
are data logged and can be easily down loaded by direct connection to your
network or from a built in flash card.
HOW TO INSTALL AND PROGRAM
THE SYSTEM
Example:- You want to
want to check the power usage (in £+p terms!) on a large oven in the factory
area which is heating components to Anneal them.
This is what you
do:-
1)
Install the current clamps on to the 3phase cable to the oven as shown :-
Fig1 picture
2)
Connect the data cable into the monitor box
fig
2
picture
3) Program
the test data:-
By simply touching the icon on the screen – type in the
information – press enter
·
Time and date of the
Start of the test
·
Time and date of the
finish of the test
·
Location of the test ie
Annealing Oven No, 2 Department 5
·
Job number of the items
being treated
Press start ! Time
taken 10 – 15 minutes



What benefit to I get from monitoring Electric Power this way?
·
True cost of processing
each component
·
You would know how much
it had cost to heat up the oven before the annealing began, also had the oven
been left running empty and for how long after the process had been completed.
This
energy monitoring system has a massive potential to save you money. How?
By
its built in ability to measure many process parameters at the same time as the
Energy Monitoring is taking place.
These include :-
·
Temperature – -40 to
+1200 degrees C
·
Track speed
·
Pressure
·
Flow gas and liquid
·
Door positioning
open/close position
·
Lighting levels
·
Etc etc
By
connecting the HMI directly to your network the information can be viewed by any
member of staff with access – a powerful tool when the cost of running their
department, their office or their equipment is displayed in front of them!
Now the really good news 1off
HMI Screen can be used to monitor, record and data log up to 22
Energy Measurement points at one time, situated anywhere on your site,
giving you the ability to have complete knowledge of where, when and how
Electricity is or has been used over any given period.
|
SALE
> HIRE > LEASE Ritec
Automation Limited, Wynns Venture Centre, Bridgtown, Cannock WS11 OXL
EMAIL:
ritec@ukonline.co.uk Fax
: 01543 502816 Tel : 01543 466050 |